Lynx Blue Line Extension & Capacity Expansion
Overhauling for capacity expansion.
Overhauling for capacity expansion.
The Lynx Blue Line Extension (BLE) was a 9.3-mile light rail extension that connected with the existing Blue Line at 7th Street Station in Center City, Charlotte, creating an 18.6-mile North/South rapid transit line. The project also included retrofitting the existing Blue Line to support capacity expansion.
Work
The BLE project featured 11 new light rail stations, 20 at-grade crossings, and 11 grade-separated structures over or under roads, railroads, and environmental features. Modern Railway Systems (MRS) was responsible for designing, furnishing, and installing the signal and communications systems. The communications systems included a new headend for train control (TDX), SCADA, CCTV, and public address/variable message signs (PA/VMS). MRS provided all communications design and equipment, including CCTV, telephones, signal houses, cab signaling (CTS), and PA/VMS systems.
Impact
The project improved transit capacity, reliability, and connectivity across Charlotte’s light rail network. The upgraded signal and communications systems enhanced operational safety, streamlined train control, and delivered a more efficient and reliable experience for passengers along the extended corridor.
Charlotte, NC
Light Rail
Bid-Build
2020
CATS
East