Modern Railway Systems https://www.modrailsystems.com/Areas/CMS/assets/img/logo.svg 8201 Southpark Lane
Littleton, CO 80120
720.542.3325

Brightline Zone 3

Connecting Miami to Orlando with a higher speed rail line.

About the Project

Overview 
The Zone 3 East-West project is part of a new high-speed rail system along Florida’s Highway 528 corridor, spanning 36 miles from Cocoa to Orlando International Airport. This segment is one of four that make up the 235-mile high-speed intercity passenger rail connecting Miami to Orlando. As the first privately owned, operated, and maintained passenger railway system in the United States, the project marks a major milestone in modern rail development. 

Scope of Work 
Modern Railway Systems (MRS) was subcontracted to procure, install, and functionally test the Automatic Train Control (ATC) wayside equipment and associated communication network. The scope included installing and testing 27 signal houses, 19 generators, 28 signals, 10 power switch machines, two maintenance crossings, 13 solar stations, two radio towers, and more than 35 miles of fiber optic cable. 

Impact 
The completed system supports train speeds of up to 125 miles per hour, advancing safe, efficient, and sustainable high-speed rail travel in the United States. 

Quick Facts

Location

Orlando, FL

Project Type

Commuter Rail

Delivery Method

Bid-Build

Year Completed

2023

Project Owner

Brightline Trains LLC

Partnering Companies

Stacy Witbeck

Region

East

Brightline 2
Brightline 3
Brightline 4

Discover the difference the right partner can make.